As of today, September 19th, we have completed 90% of our aerification process. Both of our fairway aerators developed mechanical problems, one will be fixed in the next several days. The other will require more time and probably won't be ready until next year. Because of the problems, we have decided to solid tine the back nine fairways to finish the process. Our final aerating will be in the roughs, which will be attempted next week.
As part of the process, you will have noticed we have fertilized as well, pretty much wall to wall. The greens are progressing nicely with a very quick recovery. The current weather has been a big help for healing in the holes. Within another week green speeds will have totally recovered and you should see speeds up around 10 or 10 1/2 on the stimp meter. We are planning to verticut and lightly sand on next Monday the 24th. This process will help smooth out some of the bumpiness that can creep in after aerification.
In case your wondering why we waited to aerate the putting green, we simply wanted to provide as much practice area while we were closed during aerification week . It should be back in good condition as well within a couple of weeks.
In trying to push the sand down on the greens with our watering practices, you may experience some wet areas in the surrounds on some greens and tees. This is normal due to the inability of our sprinkler system to apply water to just the greens and specific areas on the tees. Please be patient as these will continue to get better as we back off the water.
A big thank you goes out to my crew who worked very hard to get all of the aeration processes done by Wednesday. They did an outstanding job.
As we prepare for the fall and winter months, I'd like to thank our members for their patience during this process. I know things get a little messy out there during this time.
Wednesday, September 19, 2012
Friday, September 7, 2012
Fall Aerification
This Sunday at 3pm we will be starting our aerification process. We will be following play after 3pm starting on hole #1. The golf course will be closed Monday through Wednesday. Greens and Fairway aerification will take place first and should be finished by the end of the day on Tuesday. We will be using a smaller 1/2" tine on the greens to help heal faster. The fairway tines will be a 3/4" split tine. This will help the plugs that are pulled out to break down faster, so there is minimal disruption on the surface. Once the greens are done we will proceed to the tees. If our weather cooperates and equipment holds together we should have most everything done by the end of the day on Friday.
Thank you in advance for your patience during this process. We're looking forward to great conditions going into the fall and winter months.
Thank you in advance for your patience during this process. We're looking forward to great conditions going into the fall and winter months.
Thursday, August 23, 2012
Maintenance Update and Audubon Certification
On Monday of this week we verticut and lightly sanded the greens. This agronomic process is necessary to help smooth out the greens and also help keep our thatch level in check. Initially the greens can actually speed up right after the topdressing, but once the mower has been used a couple of times they tend to slow down due to the dulling of the bedknife on the mower. The very fine sand dulls the mower very quickly. Once we feel the sand has worked down a bit into the green, we place our walking mowers out to get the speed back up again. This can take several days as the sand is still present and keeping the mowers from cutting as good as they can. We will sharpen them after a few days once we know the sand is not being picked up by the mower. The speeds should increase as we will roll them as well. Thanks for your patience during this time, we try and keep the greens as consistent as we can and this process helps in this area.
We are in the planning process of becoming a Certified Audubon Cooperative Sanctuary. As one part of the process we are forming an Resource Advisory Group. The purpose of the group is to assist us in the planning and implementation of various projects and offer technical advice. Group members also help to disseminate information and help to publicize our efforts. Group members can also volunteer time or labor to help monitor enhancement efforts and help with developing an inventory of plants and animals on the property.
If you are interested in getting involved as a Advisory Group member or just want to volunteer for some of the projects, please send me an email at john.hicks@ourclub.com. You can also call me on my cell phone at 805-433-4643
Additionally, if you know of anybody locally outside of our membership who has some expertise in this area and would like to be involved please let me know, we could use the help.
Thank you
We are in the planning process of becoming a Certified Audubon Cooperative Sanctuary. As one part of the process we are forming an Resource Advisory Group. The purpose of the group is to assist us in the planning and implementation of various projects and offer technical advice. Group members also help to disseminate information and help to publicize our efforts. Group members can also volunteer time or labor to help monitor enhancement efforts and help with developing an inventory of plants and animals on the property.
If you are interested in getting involved as a Advisory Group member or just want to volunteer for some of the projects, please send me an email at john.hicks@ourclub.com. You can also call me on my cell phone at 805-433-4643
Additionally, if you know of anybody locally outside of our membership who has some expertise in this area and would like to be involved please let me know, we could use the help.
Thank you
Wednesday, August 8, 2012
Recent agronomic actvity
If you've been to the golf course in the last couple of days you will have noticed we aerated the greens with our needle tines and aerated with bigger tines on the collars. The needle tine aerification helps to let air and water penetrate the surface making for better growing conditions. The aerification on the collars is an attempt to alleviate some dry compacted areas and to provide air and water movement into the soil. We will be conducting some additional aerification throughout the golf course where we are starting to see some dry areas forming.
Our irrigation system has flaws and we are actively making improvements and adjustment as we go through the summer months. You may experience some very wet areas out there, primarily around some tee complexes and in the roughs. We are trying very hard to clear these up the best we can. Because the system we have is not a single head control system, it requires a lot of turning on and off sprinklers manually in some areas. Sometimes we don't get it right and we have to make adjustments. There has been some concerns that the course is too wet and I agree, in some areas. Our philosophy is to try and keep the turfgrass in the best possible condition both in color and in turfgrass health. Drying the course out will only invite disease, kill grass, make the course look ugly, and make for recovery in the fall much harder. It will also make it much more difficult for any kind of good playing conditions to exist in the winter months. Also note, that we try and keep the course just a little bit on the wet side going into a predicted heat spell as well. All in all it's a difficult balancing act between too wet and too dry, we strive for something in the middle as best we can.
Please feel free to contact me if there are areas that you have concerns with and we'll do the best we can to solve the problem.
Our irrigation system has flaws and we are actively making improvements and adjustment as we go through the summer months. You may experience some very wet areas out there, primarily around some tee complexes and in the roughs. We are trying very hard to clear these up the best we can. Because the system we have is not a single head control system, it requires a lot of turning on and off sprinklers manually in some areas. Sometimes we don't get it right and we have to make adjustments. There has been some concerns that the course is too wet and I agree, in some areas. Our philosophy is to try and keep the turfgrass in the best possible condition both in color and in turfgrass health. Drying the course out will only invite disease, kill grass, make the course look ugly, and make for recovery in the fall much harder. It will also make it much more difficult for any kind of good playing conditions to exist in the winter months. Also note, that we try and keep the course just a little bit on the wet side going into a predicted heat spell as well. All in all it's a difficult balancing act between too wet and too dry, we strive for something in the middle as best we can.
Please feel free to contact me if there are areas that you have concerns with and we'll do the best we can to solve the problem.
Lady Niners MGI and Ladies MGI
It was a pleasure getting the course ready again for both the Lady Niners and the Ladies MGI tournaments. While not as intense from the stand point of late nights for the Ladies MGI, it was still a challenge to keep things at a high level for the three days. The crew again was outstanding in preparing the course during this time. Thanks to the tournament committee and the pro-shop as well for helping us coordinate the set up for the different events. We look forward to next years event. A special thank you goes out to Nancy Keiter who always manages to get a batch of meatballs and goodies to the crew during the MGI events, Thank you Nancy! I even got some this time!
Tuesday, July 24, 2012
MGI and beyond
As your superintendent my first MGI tournament is under my belt and I think I can speak for the crew in saying, wow what an intense few days! First I'd like to congratulate the crew on doing an outstanding job getting the golf course ready and then keeping it tournament ready for four days. Second, a big thanks to all of the members who expressed their appreciation to me and the crew during the event and also to the pro shop staff and tournament committee for keeping us informed on the status of play. We couldn't have been more pleased with how the golf course stood up to all of the play. It was a fantastic experience here at Canterwood.
We recently prepared the golf course for the niners MGI, which went very well and we're looking forward to equally preparing the golf course for the Ladies MGI coming soon.
Golf Course Maintenance Update
We will be working in the days ahead on trying to eliminate some of the weeds in the ponds on #1 and #4. The majority of weeds are called Water Shield (Brasenia schreberi). They have been difficult to control chemically and we are going to be attempting to physically remove them by cutting the stalks under water. We will then apply some aquatic herbicide to help keep them in control. When used as directed, the chemicals applied are safe to use around wildlife
Additionally, after the Ladies MGI we will be once and for all digging into the mess at the #4 ladies tee box to see what's causing this to stay so wet and soggy. We will be removing a large portion of turf that is water logged and has a lot of thatch. We think that the area is either a spring or a possible leak in a domestic line that could be in the area.
We recently prepared the golf course for the niners MGI, which went very well and we're looking forward to equally preparing the golf course for the Ladies MGI coming soon.
Golf Course Maintenance Update
We will be working in the days ahead on trying to eliminate some of the weeds in the ponds on #1 and #4. The majority of weeds are called Water Shield (Brasenia schreberi). They have been difficult to control chemically and we are going to be attempting to physically remove them by cutting the stalks under water. We will then apply some aquatic herbicide to help keep them in control. When used as directed, the chemicals applied are safe to use around wildlife
Additionally, after the Ladies MGI we will be once and for all digging into the mess at the #4 ladies tee box to see what's causing this to stay so wet and soggy. We will be removing a large portion of turf that is water logged and has a lot of thatch. We think that the area is either a spring or a possible leak in a domestic line that could be in the area.
Saturday, June 23, 2012
Recent Vandalism
A few days ago we had someone cut some donuts with a vehicle on #5, #14 and # 15 fairways.While we were able to fix the damage quickly, it tied up three of our staff for a day and half to repair. Things of course could have been a lot worse. Unfortunately there were no witnesses to this vandalism and we are working with security to gather more information. If anyone has information please give myself or security a call.
![]() | |||
| #14 fairway |
![]() |
| #15 fairway |
![]() |
| #5 fairway |
![]() |
| #14 repaired |
Subscribe to: